Page 71 - planning-committee-packet
P. 71

PLANS ISSUED FOR:
                                                                                     ML                                                                 SEQUENCE OF CONSTRUCTION:
                                                                                                                                                       1.
                                                                                                                                                        CONTACT  TOWN  OF  BERLIN  DEPARTMENT  OF  WATER  RESOURCES  AT  (410)  641-3845  TO
                                                                                                                                                        SCHEDULE A PRE-CONSTRUCTION MEETING AT LEAST 48 HOURS PRIOR TO COMMENCING  Review
                                                                                                                                                        ANY SITE WORK.  FAILURE TO DO SO MAY RESULT IN AN IMMEDIATE "STOP WORK ORDER".
                                                                                                                                                       2.  CLEAR  AND  GRUB  AREA  NECESSARY  TO    INSTALL  PERIMETER  CONTROLS,  AND  INSTALL  REVISIONS:
                                                                                                                                                        SILT FENCE AND SUPER SILT FENCE.
                                                                                                                                                       3.
                                                                                                                                                        INSTALL STABILIZED CONSTRUCTION ENTRANCES (SCE), AS SHOWN ON PLAN.
                                                                                                                                                        INSTALLATION  OF  PERIMETER  CONTROLS  BUT  PRIOR  TO  THE  PROCEEDING  WITH  ANY
                                                                                                                                               NW  N  NE  4.  CONTACT  WORCESTER  ENVIRONMENTAL  PROGRAMS  AT  (410)  632-1220  AFTER  THE  No.  Revision/Issue:  Date
                                                                                                                                                        OTHER EARTH DISTURBANCE OR  GRADING.
                                                                                                                                               W  Ma r y l a n d   S t a t e   G r i d   NAD   8 3  E  5.  CLEAR  AND  GRUB  THE  REMAINING  EXISTING  VEGETATION  WITHIN  THE  LIMITS  OF
                                                                                                                                                SW  SE  6.  DISTURBANCE, WITHOUT CLEARING EXISTING SINGLE TREES SHOWN ON THIS PLAN.
                                                                                                                                                        REMOVE EXISTING SIGNS MARKED TO BE REMOVED.
                                                                        N/F STANLEY J. SMUCK                                                     S     7.  TEMPORARY  STABILIZATION  SHALL  BE  PROVIDED  TO  DISTURBED  AREAS  WITHIN  THREE  (3)
                                                                        TAX MAP 301, PARCEL 682                                                         CALENDAR DAYS.
                   ML                                                   DEED:  RHO 1613/ 394                                                           8.  CONSTRUCT  TEMPORARY SEDIMENT  BASIN (TSB1). INSTALL WEIR STRUCTURE  AND OUTFALL
                                                                                                                                                        SWALE.  CONSTRUCT  TEMPORARY  SEDIMENT  BASIN  (TSB2).  INSTALL  OUTFALL  PIPE  AND
                                                                                                                                                        RIP-RAP STABILIZATION.
                                                                                                                                                       9.  GRADE ENTRANCE, ROADS, AND PARKING AREAS PER PROPOSED GRADES PROVIDED.
                                                                                                                                                       10. INSTALL  GRASS  SWALE  ASSOCIATED  WITH  TSB  1.  INSTALL  INFLOW  PIPES  ASSOCIATED  WITH
                                                                                                                                                        TSB2 AND RIP RAP STABILIZATION.
                                                                                                                                                       11. STABILIZE ANY DISTURBED AREAS THAT REMAIN.
                                                                                                                                                       12. FINALIZE GRADES AND PAVE AS SHOWN ON PLANS.
                                                                                                                                                       13. STABILIZE ALL AREAS. FLUSH STORM DRAINS AND REMOVE ACCUMULATED SEDIMENT.
                                                                                                                                                       14. CONVERT SUBMERGED GRAVEL WETLAND 1 (SGW1). CONVERT TSB2 TO SUBMERGED GRAVEL
                                                                                    TYPICAL           PALUSTRINE FORESTED WETLANDS                      WETLAND  2  (SGW2).  STORM  FACILITIES  MUST  BE  INSPECTED  THROUGHOUT  THEIR
                                                                                    DITCH                                                               CONSTRUCTION.
                                                                                    CENTERLINE                                                         15. STABILIZE  ALL  REMAINING  DISTURBED  AREAS  WITH  PERMANENT  VEGETATION  OR  SITE
                                                                                                                                                        SPECIFIC VEGETATION AS NOTED.
                                      TYPICAL DITCH TIE-LINE                                                                                           16. IF  CONSTRUCTION  IS  NOT  INITIATED  WITHIN  SEVEN  (7)  DAYS,  STABILIZE  ALL  DISTURBED
                                       FOR COMPUTATIONAL     BOUNDARY RUNS                                                                              AREAS NOT STABILIZED BY STONE, GRAVEL, PAVING, CONCRETE, OR LANDSCAPING ROCK AS
                                                             BY AND WITH THE
                                        PURPOSES ONLY                                                                                                   PER PERMANENT VEGETATIVE STABILIZATION REQUIREMENTS.
                                                             DITCH  CENTERLINE
                                                                                                                                                       17. PERIMETER  CONTROLS  TO  REMAIN  IN  PLACE  UNTIL  ALL  CONSTRUCTION  ACTIVITIES  ARE
                                                                                                                                                        COMPLETED.
                                                                                                                                                       18. INSPECTION  BY  AN  MDE  INSPECTOR  SHALL  BE  DONE  AFTER  THE  SITE  IS  COMPLETELY
                                                                                                                                                        STABILIZED BUT PRIOR TO THE REMOVAL OF THE PERIMETER CONTROLS.
                                                                                                                                                       19. FOLLOWING FINAL SITE STABILIZATION, REMOVE PERIMETER CONTROLS AND STABILIZE AREAS
                                                                                                                                                        DISTURBED DURING THEIR REMOVAL.
                                                                                                                                                       20. ALL  MAINTENANCE  OF  THE  FINAL  SITE  SHALL  BE  CONTROLLED  BY  THE  SITE  OWNER.
                                                                                                                                       DB. 7468 PG. 125  MAINTENANCE  SHALL  BE  PERFORMED  AS  NECESSARY  TO  ENSURE  THE  STABILIZED  AREAS
                                                                                                                                         ITEM ONE       CONTINUOUSLY  MEET  THE  APPROPRIATE  REQUIREMENTS  OF  THE  "2011  MARYLAND
                                                                                                                                                        STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL."
                                                                                                                                                       CONSTRUCTION & RESPONSIBILITY NOTES:
                                                                  N/F NEEV PROPERTIES, LLC                                                             1. CONTRACTOR  SHALL  BE  REQUIRED  TO  PROVIDE  ALL  MATERIALS  AND  APPURTENANCE
                                                                  TAX MAP 301, PARCEL 683                                                              NECESSARY  TO  COMPLETE  PROJECT  CONSTRUCTION  AS  SHOWN  ON  THE  DRAWINGS    AND
                                                                                                                                                       DESCRIBED IN THE SPECIFICATIONS.
                                                                     LOT A                                              25' WETLAND OFFSET             2. THE  CONTRACTOR  SHALL  CONTACT  MISS  UTILITY  FOR  LOCATION  OF  UNDERGROUND
                                                                   DEED:  SRB 7468/ 125                                                                UTILITIES PRIOR TO CONSTRUCTION. (800-441-8355)
                                                                   PLAT:  SVH 230/ 5 &  EXISTING PIPE TO                                               3. THE CONTRACTOR SHALL CONFINE HIS ACTIVITIES TO THE SITE. ANY DAMAGE TO EXISTING
                                                                  SVH 231/ 47 & 48, FWH 56/ 1  BE REMOVED
                                                                                                                                                       UTILITIES,  ETC.  CAUSED  BY  THE  CONTRACTORS  NEGLECT  SHALL  BE  REPAIRED  BY  THE
                                                                                                                                                       CONTRACTOR AT HIS OWN EXPENSE.
                                                                                                                                                       4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY FOR CONSTRUCTION PERMITS AND FEES.  SOUTH MOON UNDER  TOWN OF BERLIN WORCESTER COUNTY, MARYLAND
                                                                                                                                                       5. CONTRACTOR SHALL COORDINATE ALL WORK WITH WORCESTER COUNTY.
                                                                                                                                                       6. THE  CONTRACTOR  SHALL  BE  RESPONSIBLE  FOR  COORDINATION  OF  ONGOING  INSPECTION
                          DB. 7468 PG. 125                                                                                                             AND  ACCEPTANCE  BY  WORCESTER  COUNTY  ROADS,  WORCESTER  COUNTY  HEALTH
                           ITEM THREE                                                                                                                  DEPARTMENT AND WORCESTER COUNTY SANITARY DISTRICT.
                                                                                                                                                       7. THE CONTRACTOR SHALL INSTALL ALL EROSION AND SEDIMENT CONTROL FACILITIES SHOWN
                                                                                                                                                       HEREON,  AND  THEY  SHALL  BE  APPROVED  BY  THE  MARYLAND  DEPARTMENT  OF  THE
                                                                                                                                                       ENVIRONMENT  OR  THEIR  AUTHORIZED  AGENTS  PRIOR  TO  THE  START  OF  ANY  GRADING
                                                                                                                                                       OPERATIONS OR CONSTRUCTION.
                                                                                                                                                       8. FOLLOWING INITIAL SOIL DISTURBANCE OR REDISTURBANCE, PERMANENT OR TEMPORARY
                                                                                                                                                       SITE  STABILIZATION  SHALL  BE  COMPLETED  WITHIN  THREE  (3)  CALENDAR  DAYS  ON  ALL
                                                                                                                                                       PERIMETER  CONTROLS,  DIKES,  SWALES,  DITCHES,  PERIMETER  SLOPES  AND  ALL  SLOPES
                                                                                                                                                       GREATER THEN 3 HORIZONTAL TO ONE VERTICAL (3:1) AND WITHIN SEVEN (7) DAYS ON ALL
                                           25' WETLAND OFFSET
                                                                                                                                                       OTHER DISTURBED OR GRADED AREAS ON THE PROJECT SITE.
                                                                           SSF/                    N/F NEEV PROPERTIES, LLC                            9. IF  DURING  ANY  PERIOD  OF  CONSTRUCTION  THERE  SHOULD  BE  A  PROBLEM  WITH  EROSION
                                                                                                    TAX MAP 301, PARCEL 683
                    150 ft. MDSHA R.O.W. (U.S. 113)
                                                                                                                                                       CONTROL,  THE  PROPER  AND  NECESSARY  MEASURES  WILL  BE  TAKEN  TO  CORRECT  THE
                                                                    SSF/   LOD  SF-   OUTFALL       DEED:  SRB 7468/ 125                               10. ALL DISTURBED AREAS NOT PAVED OR SURFACED SHALL BE REVEGETATED AND STABILIZED
                                    ITEM No. 1
                                                                    LOD
                                    ITEM No. 3
                                30' WIDE ACCESS EASEMENT DB. ODC 42 PG. 450  ITEM ONE  10' MAINTENANCE  SSF/  LOD  TSB1  SF- LOD  LOD  STORMWATER      12. THE APPROVAL OF THIS PLAN FOR SEDIMENT EROSION CONTROL DOES NOT RELIEVE THE
                                                                                                                                                       PROBLEM BY THE OWNERS AND/OR THE CONTRACTOR(S).
                                                                                                      ITEM TWO
                                                      PROPOSED SUBMERGED
                                                              SSF/
                                                      GRAVEL WETLANDS
                                                              LOD
                                                                                                     PLAT:  FWH 56/ 1
                                                                                                                                                       FOLLOWING THE RECOMMENDATIONS SHOWN ON THE DETAIL SHEET FOR TEMPORARY AND
                                                                                                      ODC 42/ 452
                                                                                                                                                       PERMANENT SEEDING.
                                                                                      RIP RAP
                                         DB. 7468 PG. 125
                                                                                                                                                       11. ALL  PHASES  OF  CONSTRUCTION  WILL  ADHERE  TO  ALL  EROSION  AND  SEDIMENT  CONTROL
                                                                   SGW1
                                                                                                                                                       MEASURES AS SET FORTH IN THE APPROVED EROSION AND SEDIMENT CONTROL PLAN FOR
                                                        EASEMENT
                                                                                     EXISTING
                                                                                                                                                       THIS SITE. THE SEDIMENT CONTROL APPROVALS ON THIS PLAN EXTEND ONLY TO THE AREAS
                                                                                                                                                       AND PRACTICES IDENTIFIED AS PROPOSED WORK.
                                                                                    MANAGEMENT
                                                                                     POND
                                                                                                                                                       DEVELOPER/CONSULTANT  FROM  COMPLYING  WITH  ANY  FEDERAL/STATE/COUNTY/TOWN
                                                                                                                                                       REQUIREMENTS PERTAINING TO ENVIRONMENTAL ISSUES.
                                                                                                                                                       SEDIMENT & EROSION CONTROL NOTES:
                          U.S. ROUTE 113  150' ROW  N/F NEEV PROPERTIES, LLC  LOD  SF-  LOD  SF  GRASS SWALE  SF-  LOD  OFFICE  SF-  LOD  SF-  SF-  LOD  SF-  1. ON ALL SITES WITH DISTURBED AREAS, APPROVAL OF THE STATE OF MARYLAND SHALL BE   an scape Arc itects
                                                      SF-
                                                                                          LOD
                                                                                                                                                       REQUESTED  UPON COMPLETION OF THE INSTALLATION OF PERIMETER EROSION AND
                                                                                      LOD
                                                                                                                                                       SEDIMENT CONTROLS, BUT BEFORE PROCEEDING WITH ANY OTHER EARTH DISTURBANCE OR
                                                                                                                                                       GRADING. OTHER BUILDING OR GRADING APPROVALS MAY NOT BE AUTHORIZED UNTIL THIS
                                                                                                                                                       INITIAL APPROVAL BY THE STATE OF MARYLAND IS MADE.
                                                                                                                                                       2. APPROVAL SHALL BE REQUESTED UPON FINAL STABILIZATION OF ALL SITES WITH DISTURBED
                                                                                                                                                       AREAS BEFORE REMOVAL OF CONTROLS.
                                       TAX MAP 301, PARCEL 684
                                                                                                                                                  N/F NICOLE S. MOORE
                                                                                                                                                       3. THE DEVELOPER SHALL REQUEST THAT THE STATE OF MARYLAND APPROVED WORK
                                        (ITEM FRANKLIN AVENUE)
                                                                                                                                                       COMPLETED AT THE STATES OF CONSTRUCTION SPECIFIED BELOW IN ACCORDANCE WITH THE
                                                                                                                                                  DEED:  SRB 6511/ 290
                                        DEED:  SRB 7468/ 125  SF  -1.00%  SF-  LOD  6" PVC  BUILDING                                        N/F MALLORY F.  TAX MAP 301, PARCEL 737   i il  n ineers   an   lanners   ur e ors
                                         PLAT:  FWH 56/ 1                  DECK                                                N/F RODNEY  N/F MARGARET  ECKMAN, et vir.  APPROVED PLAN, THE GRADING PERMIT OR THE BUILDING PERMIT.
                                         ODC 42/ 452  LOD  SF-                  CONCRETE WALK                                  K. BAILEY  NEWTON, et al.  TAX MAP 301,
                                                                                                                                                       4. ALL SEDIMENT CONTROL DEVICES SHALL REMAIN IN OPERATION UNTIL THE CONSTRUCTION
                                                        SSA                                                                    TAX MAP 301,  TAX MAP 301,  PARCEL 738  PROJECT IS FULLY STABILIZED BY VEGETATION OR PAVING AND FREE FROM ALL SEDIMENT.
                                                                         CONCRETE WALK          N/F SILVESTER  N/F RODNEY K. BAILEY  N/F CRYSTAL LOCKWOOD  PARCEL 740  DEED:  SVH 5806/ 317  5. PERIODIC INSPECTION AND REPAIR OF ALL EROSION CONTROL DEVICES IS THE SOLE
                                                                            WOOD
                                                                                                                                     PARCEL 739
                                          LIMIT OF DISTURBANCE:  SF         RAMP            LOD  SF-  SMITH, et ux.  N/F BEATRICE COLLICK, et al.  TAX MAP 301,  TAX MAP 301, PARCEL 741  DEED:  SVH  DEED:  69/ 364  RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL INSPECT AND REPAIR ALL
                                                                                                       TAX MAP 301, PARCEL 743
                                                                                                                 PARCEL 742
                                          ±124,504 SF. (2.86 AC.)      6" PVC  ~     LOD         TAX MAP 301,  DEED:  RHO 1682/ 568  DEED:  SVH 5685/ 191  DEED:  SVH 4428/ 547  2151/ 432  DAMAGE CAUSED BY STORM EVENTS, SUBCONTRACTORS, I.E. UTILITY COMPANIES, ETC.,
                                                                                                                                                       VANDALISM AND GENERAL DISREPAIR.
                                                               S         LOD           LOD       PARCEL 744                   PLAT:  PAGE 435          6. IF THE APPROVED PLAN NEEDS TO BE MODIFIED, ADDITIONAL SEDIMENT AND STORM WATER
                                                                                                DEED:  SRB 6041/ 237
                                                               WM                                                                                      CONTROL MEASURES MAY BE REQUIRED AS DEEMED NECESSARY BY THE WORCESTER CO. SOIL
                                   SF-                                8" PVC                                                                           CONSERVATION DISTRICT.
                                                    SF-
                                                   LOD
                        PROPOSED   LOD    FUTURE COMMERCIAL  SF                   OFFICE  LOD                                                          7. IF DUST CREATED TRAFFIC SAFETY PROBLEMS, HEALTH HAZARDS, OR OFF-SITE DAMAGE,
                        SUBMERGED  SF-     DEVELOPMENT                            BUILDING                                                             THE SITE SHALL BE SPRINKLED WITH WATER UNTIL THE SURFACE IS MOIST. REPEAT AS
                       GRAVEL WETLANDS  LOD  LOD  SF-  PAD SITE                      LOD     LOD  SF-                                                  NECESSARY.                        10044 Old Ocean City Boulevard Berlin, Maryland 21811  Ph: (410) 629-1160 Fax: (410) 629-1710 www.the-atlanticgrp.com
                                                                           EXISTING SIGNS                                                                                            Atlantic Group
                                                                          LOD
                                                      SF                 ~  TO BE REMOVED  LOD  DEED BOOK ODC 42 PAGE 450                              8. FOREST CONSERVATION DOES NOT APPLY TO THIS SITE.
                                                                                                                                                       9. APPROVED PLANS REMAIN VALID FOR 2 YEARS FROM THE DATE OF APPROVAL, EXCEPT
                                                                                                10' WIDE ACCESS EASEMENT TO
                                                                                                                                                       SURFACE MINES AND LANDFILL PLANS WHICH REMAIN VALID FOR 5 YEARS FROM THE DATE OF
                            SF-  LOD  SGW2  10' MAINTENANCE  SF- LOD       LOD  LOD             CYRUS WARREN LANDS, NOW                                APPROVAL UNLESS SPECIFICALLY EXTENDED OR RENEWED BY THE APPROVAL AUTHORITY.
                                         & ACCESS
                                                                                                BELIEVED EXTINGUISHED.
                                         EASEMENT
                                   TSB2                                                                                                                10. ALL WORK AREAS SHALL BE STABILIZED AT THE END OF THE DAY.  & Associates, Inc.
                                                                                                                                                       11. DEWATER TO A POTABLE SEDIMENT TANK IF NEEDED.
                            -2.83%      LOD  SF-  SF- LOD  40' ACCESS                      LOD                                                         12. ANYTIME A SOIL EROSION OR SEDIMENT CONTROL PROBLEM OCCURS, PROMPT AND
                                                                                                                                                       NECESSARY MEASURES WILL BE TAKEN BY THE OWNER AND/OR CONTRACTOR TO CORRECT
                                                    EASEMENT
                                                                                                                                                       THE PROBLEM.
                                          PROPOSED ENTRANCE DRIVE  SF- LOD  LOD  LOD  LOD  LOD  LOD                                                    STOCKPILE AREA:
                               SF-  LOD                                                 LOD  PLAYGROUND                                                13. ALL PHASES OF CONSTRUCTION WILL ADHERE TO ALL SEDIMENT AND EROSION CONTROL
                                                                                                                                                       MEASURES AS SET FORTH IN THE APPROVED SEDIMENT AND EROSION CONTROL PLAN FOR THIS
                                                                                                                                                       SITE.
                                                               SF-
                                 SF-  LOD            SF- LOD     LOD  SF-                         PRIVACY FENCE                                        1. THE FOOTPRINT OF THE STOCKPILE MUST BE SIZED TO ACCOMMODATE THE ANTICIPATED
                                                                                                                                                       VOLUME OF MATERIAL AND BASED ON A SIDE SLOPE RATIO NO STEEPER THAN 2:1. BENCHING
                                              -0.25%    OCCUPATION        LOD                                                                          2. RUNOFF FROM THE STOCKPILE AREA MUST DRAIN TO A SUITABLE SEDIMENT CONTROL
                                                                                                                                                       MUST BE PROVIDED IN ACCORDANCE WITH SECTION B-3 LAND GRADING
                                                        APPARENT
                                22.5'           SF- LOD  AS ILLUSTRATED                    OFFICE BUILDING                                             PRACTICE.
                                               RIP-RAP  PLAT: 2412 F.595                                                                               3. ACCESS THE STOCKPILE AREA FROM THE UPGRADE SIDE.
                                          CIP  SF-  OUTLET                      OFFICE                                                                 4.  WHERE RUNOFF CONCENTRATES ALONG THE TOE OF THE STOCKPILE FILL, AN APPROPRIATE
                                            LOD  SEE DETAIL                 EXISTING SIGNS BUILDING                                                    EROSION/SEDIMENT CONTROL PRACTICE MUST BE USED TO INTERCEPT THE DISCHARGE.
                                   LOD
                                               D-7 SHEET          LOD  SF-  LOD  TO BE REMOVED                                                         5.  STOCKPILES MUST BE STABILIZED IN ACCORDANCE WITH THE 3/7 DAY STABILIZATION
                                               C-500                                                                                                   REQUIREMENT AS WELL AS STANDARD B-4-1 INCREMENTAL STABILIZATION AND STANDARD
                                        SF- LOD                         LOD                                                                            6. IF THE STOCKPILE IS LOCATED ON AN IMPERVIOUS SURFACE, A LINER SHOULD BE PROVIDED
                                                                                                                                                       B-4-4 TEMPORARY STABILIZATION.
                                      LOD
                               D=33° 08' 23"           N/F PATRICK H. SCANLON                                                                          BELOW THE STOCKPILE TO FACILITATE CLEANUP. STOCKPILES CONTAINING CONTAMINATED
                                R=250.00'               LOT 1 P/O 686                                                                                  MATERIAL MUST BE COVERED WITH IMPERMEABLE SHEETING.
                                L=144.60'             TAX MAP 301, PARCEL 685
                               N40°00'02"W             DEED:  RHO 2412/ 591  LOD  SF-
                                C=142.59'               PLAT:  PG. 595  LOD
                                              N/F PATRICK H. SCANLON
                                              TAX MAP 301, PARCEL 685
                                              DEED:  RHO 2412/ 591
                                               PLAT:  PG. 595
                                                                                              WAREHOUSE
                                  EXISTING  OFFICE COMPLEX  ROW VARIES  FRANKLIN  MACHINE  WAREHOUSE                                                                               EROSION AND
                                                           SHOP
                                                                                                      29'                                              OWNER'S CERTIFICATION:
                                         AVENUE
                                                                                                               RAILROAD   AVENUE                       1. ANY CLEARING, GRADING, CONSTRUCTION OR  DEVELOPMENT, OR ALL OF THESE, WILL BE  SEDIMENT
                                                                                                                                                       DONE PURSUANT TO THIS PLAN.
                                                                                                             29' ROW  N/F HISTORIC RAILROADS, INC.     2. THE  RESPONSIBLE  PERSONNEL  INVOLVED  IN  THE  CONSTRUCTION  PROJECT  WILL  HAVE  CONTROL PLAN
                                                         30' WIDE PERPETUAL ROW  ITEM No. 2                     TAX MAP 301, PARCEL 683                CERTIFICATION  OF  TRAINING  AT  THE  DEPARTMENT  APPROVED  TRAINING  PROGRAM
                                                     30'               ITEM No. 4                                DEED:  FWH 441/ 014                   (GREEN-CARD  CERTIFICATION  FOR  THE  CONTROL  OF  SEDIMENT  AND  EROSION  BEFORE
                                                                                                       60'
                                                                                                                 PLAT:  WCL 85/ 027                    BEGINNING THE PROJECT.  CERTIFICATION MAY BE WAIVED BY THE APPROVAL AUTHORITY
                                                                                                                                                       ON  ANY  PROJECT  INVOLVING  FOUR  OR  FEWER  RESIDENTIAL  UNITS)  AND  AS  APPLICABLE
                                                                                                                                                       PER COUNTY.
                                                                                                                                                       3. THE DEVELOPER WILL BE PROVIDED ONE COPY OF A RED LINE AS-BUILT DRAWING OF EACH
                                       DISTURBED                  FORMER B & E RR ROW                                                                  FACILITY REQUIRING A STATE POND PERMIT.  PROJECT:  No.  DATE:  11/21/2019
                                        CMF
                                                      60'
                                                                                                                                                                                  DRAWN BY:  CDD  SCALE:  1" = 50'
                                                                                                                                                       SIGNATURE:                                                                     .
                                                                             DISTURBED                                                                     8.13.25 PC Meeting Packet_pg. 61 of 78
                                                                              CMF                                                                                                 SHEET:
                                                                                                        N/F ST. PAUL UMC                               DATE:                                                                      .  C-104
                                                                                                      TAX MAP 301, PARCEL 735
                                                                                                        DEED:  26/ 87
                                        TYPICAL 2' WIDE
                                                                                                N/F DENA D.
   66   67   68   69   70   71   72   73   74   75   76