Page 69 - planning-committee-packet
P. 69

ML                                                                 SUBMERGED GRAVEL WETLAND CONSTRUCTION AND  PLANS ISSUED FOR:
                                                                                                                                                      INSTALLATION GUIDELINES:         Review
                                                                                                                                                                                      REVISIONS:
                                                                                                                                                       1.  ALL ON-SITE DISTURBED AREAS SHOULD BE STABILIZED PRIOR TO
                                                                                                                                                NW  N  NE  ALLOWING RUNOFF TO ENTER THE NEWLY CONSTRUCTED WETLAND.  No.  Revision/Issue:  Date
                                                                                                                                               W  Ma r y l a n d   S t a t e   Gr i d   NAD   8 3  E  2.  THE PROPOSED LOCATION OF A SUBMERGED GRAVEL WETLAND
                                                                                                                                                        SHALL BE PROTECTED DURING CONSTRUCTION. SURFACE RUNOFF
                                                                                                                                                SW  SE
                                                                      N/F STANLEY J. SMUCK                                                       S      SHALL BE DIVERTED AWAY FROM THE PRACTICE DURING GRADING
                                                                      TAX MAP 301, PARCEL 682                                                           OPERATIONS. FLOW SPLITTERS AND OTHER CONVEYANCE
                   ML                                                 DEED:  RHO 1613/ 394                                                              INFRASTRUCTURE SHALL BE BLOCKED.
                                                                                                                                                       3.  WETLAND CONSTRUCTION SHALL BE PERFORMED WITH
                                                                                                                                                        LIGHTWEIGHT, WIDE-TRACKED EQUIPMENT TO MINIMIZE
                                                                                                                                                        DISTURBANCE AND COMPACTION. EXCAVATED MATERIALS SHALL BE
                                                                                                                                                        PLACED IN A CONTAINED AREA. ANY PUMPING OPERATIONS SHALL
                                                                                                                                                        DISCHARGE FILTERED WATER TO A STABLE OUTLET.
                                                                                  TYPICAL           PALUSTRINE FORESTED WETLANDS                       4.  THE AGGREGATE SHALL BE COMPOSED OF AN 18 TO 48 INCH LAYER
                                                                                  DITCH                                                                 OF CLEAN WASHED, UNIFORMLY GRADED MATERIAL WITH A
                                                                                  CENTERLINE
                                    TYPICAL DITCH TIE-LINE  BOUNDARY RUNS                                                                               POROSITY OR 40%. ROUNDED BANK RUN GRAVEL IS RECOMMENDED.
                                     FOR COMPUTATIONAL    BY AND WITH THE
                                      PURPOSES ONLY
                                                          DITCH  CENTERLINE                                                                           MAINTENANCE AND INSPECTION:
                                                                                                                                                       1.  REGULAR INSPECTIONS SHALL BE MADE DURING THE FOLLOWING
                                                                                                                                                        STAGES OF CONSTRUCTION:
                                                                                                                                                        - DURING EXCAVATION TO SUBGRADE.
                                                                                                                                     DB. 7468 PG. 125
                                                                                                                                       ITEM ONE         - DURING PLACEMENT OF BACKFILL OF PERFORATED INLET PIPE AND
                                                                                                                                                        OBSERVATION WELLS.
                                                                                                                                                        - DURING PLACEMENT OF GEOTEXTILES AND ALL FILTER MEDIA.
                                                                                                                                                        - DURING CONSTRUCTION OF ANY APPURTENANT CONVEYANCE
                                                                N/F NEEV PROPERTIES, LLC                                                                SYSTEMS SUCH AS DIVERSION STRUCTURES, INLETS, OUTLETS, AND
                                                                TAX MAP 301, PARCEL 683                                                                 FLOW DISTRIBUTION STRUCTURES.
                                                                   LOT A                                              25' WETLAND OFFSET
                                                                 DEED:  SRB 7468/ 125                                                                   - UPON COMPLETION OF FINAL GRADING AND ESTABLISHMENT OF
                                                                 PLAT:  SVH 230/ 5 &                                                                    PERMANENT STABILIZATION, AND BEFORE ALLOWING RUNOFF TO
                                                                SVH 231/ 47 & 48, FWH 56/ 1
                                                                                                                                                        ENTER THE WETLAND.
                                                                                                                                                       2.  PRIVATELY OWNED PRACTICES SHALL HAVE A MAINTENANCE PLAN  SOUTH MOON UNDER  TOWN OF BERLIN WORCESTER COUNTY, MARYLAND
                                                                                                                                                        AND SHALL BE PROTECTED BY EASEMENT, DEED RESTRICTION,
                                                                                                                                                        ORDINANCE, OR OTHER LEGAL MEASURES PREVENTING ITS NEGLECT,
                        DB. 7468 PG. 125
                         ITEM THREE                                                                                                                     ADVERSE ALTERATION, AND REMOVAL.
                                                                                                                       SEQUENCE OF CONSTRUCTION: SGW2
                                                                                                                                                       3.  DURING THE FIRST YEAR OF OPERATION, INSPECTIONS SHOULD BE
                                                                                                                                                        CONDUCTED AFTER EVERY MAJOR STORM AND POORLY ESTABLISHED
                                                                                                          Step 1:   Stabilize the Drainage Area. Dewater facility during the transition from TSB-2 to SGW2 using approved skimmering device
                                                                                                                                                        AREAS REVEGETATED.
                                                                                                              or geotextile bag. Regrade to design dimensions.
                                                                                                          Step 2:   Assemble Construction Materials on-site, make sure they meet design specifications, and prepare any staging areas. Ensure  3.1. INSPECT TO BE CERTAIN SYSTEM DRAINS WITHIN 24-72 HRS
                                                                                                              that appropriate compaction and dewatering equipment is available. Locate the project benchmark and if necessary transfer  (WITHIN THE DESIGN PERIOD, BUT ALSO NOT SO QUICKLY AS TO
                                         25' WETLAND OFFSET
                                                                                                                                                          MINIMIZE STORMWATER TREATMENT)).
                                                      PROPOSED SUBMERGED  SGW-1 OUTFALL  ROP-II  INV. OUT: 21.50  OUTFALL  N/F NEEV PROPERTIES, LLC  Step 3:   a benchmark nearer to the Submerged Gravel Wetland location for use during construction.  3.2. WATERING PLANTS AS NECESSARY DURING THE FIRST GROWING
                  150 ft. MDSHA R.O.W. (U.S. 113)
                                                                        18" HDPE
                                                                                                  TAX MAP 301, PARCEL 683
                                                                                                              Install Erosion and Sediment Controls prior to construction, including temporary de-watering devices and stormwater
                                                       GRAVEL WETLANDS
                                                                         L: 49.93'
                              30' WIDE ACCESS EASEMENT DB. ODC 42 PG. 450  10' MAINTENANCE  ROP-I  BH-4  SGW1 BH-5  BH-6 D-14  STORMWATER  Step 5:   Install Outfall Structure, Pipe, and riprap.  4.  3.5. QUARTERLY INSPECTION OF SOIL AND REPAIRING ERODED
                                                                                                  DEED:  SRB 7468/ 125
                                                                                                              diversion practices. All areas surrounding the Wet Pond that are graded or denuded during construction must be planted
                                                                         S: 0.34%
                                                        SEE DETAIL D-10
                                                                                                                                                          SEASON
                                                                                                    ITEM TWO
                                                        SHEET C-501
                                                                                                   PLAT:  FWH 56/ 1
                                                                                                              with turf grass, native plantings, or other approved methods of soil stabilization. See sheet C-501 for details.
                                                                                                                                                        3.3. RE-VEGETATING POORLY ESTABLISHED AREAS AS NECESSARY
                                                                                                    ODC 42/ 452
                                                                                                              Clear and Strip the embankment area to the desired sub-grade.
                                                                                                          Step 4:
                                                                                    RIP RAP
                                                                                                                                                        3.4. TREATING DISEASED VEGETATION AS NECESSARY
                                                      EASEMENT
                                                                                   EXISTING
                                                                                                          Step 6:
                                                                                                              Excavate/Grade until the appropriate elevation and desired contours are achieved for the bottom and side slopes of SGW1.
                                                                                                                                                          AREAS, ESPECIALLY ON SLOPES
                                                                                                              Install base stone per cross section D-15/C-501.
                                                                                  MANAGEMENT
                                                                      C-501
                                                                                                                                                        3.6. CHECKING INLETS, OUTLETS, AND OVERFLOW SPILLWAY FOR
                                                                                   POND
                                                                                                          Step 7:
                                                                                                              Stabilize Exposed Soils with the approved seed mixtures appropriate for the perimeter area of SGW1. All areas above the
                                                                                                                                                          BLOCKAGE, STRUCTURAL INTEGRITY, ANDEVIDENCE OF EROSION.
                                                                                                              permanent pool elevation should be permanently stabilized in accordance with the vegetative stabilization specifications on
                                                                                                                                                         INSPECTION FREQUENCY SHOULD BE AT LEAST EVERY 6 MONTHS
                                                                                                              the approved Sediment and Stormwater Management Plan. See sheet C-501 for details.
                        U.S. ROUTE 113  150' ROW  N/F NEEV PROPERTIES, LLC  2' WIDE SWALE  GRASS SWALE  OFFICE                                          INSPECTION FREQUENCY CAN BE REDUCED TO ANNUAL FOLLOWING   an scape Arc itects
                                                                                                                                                        THEREAFTER, OR AS THE LOCAL JURISDICTION DEEMS NECESSARY.
                                                                                                              Plant the Submerged Gravel Wetland per sheet C-108. See wetland seed mix this sheet.
                                                                                                          Step 8:
                                                                                                                                                        2 YEARS OF MONITORING THAT INDICATES THE RATE OF SEDIMENT
                                                                                                                                                        ACCUMULATION IS LESS THAN THE CLEANING CRITERIA LISTED
                                                                                                                                                        BELOW. INSPECTIONS SHOULD FOCUS ON:
                                     TAX MAP 301, PARCEL 684
                                                                                                                                                N/F NICOLE S. MOORE
                                     (ITEM FRANKLIN AVENUE)
                                                                                                                                                          MAT ESTABLISHMENT ACROSS THE WETLAND SURFACE.
                                                                                                                                                DEED:  SRB 6511/ 290
                                      DEED:  SRB 7468/ 125  BOTTOM  -1.00%  6" PVC  BUILDING                                              N/F MALLORY F.  TAX MAP 301, PARCEL 737  4.1. CHECKING THE FILTER SURFACE FOR DENSE, COMPLETE, ROOT   i il  n ineers   an   lanners   ur e ors
                                       PLAT:  FWH 56/ 1                  DECK                                                N/F RODNEY  N/F MARGARET  ECKMAN, et vir.  THOROUGH REVEGETATION WITH GRASSES, FORBS, AND
                                       ODC 42/ 452                            CONCRETE WALK                                  K. BAILEY  NEWTON, et al.  TAX MAP 301,  SHRUBS IS NECESSARY. UNLIKE BIORETENTION, WHERE MULCH
                                                                       CONCRETE WALK                         N/F RODNEY K. BAILEY  N/F CRYSTAL LOCKWOOD  TAX MAP 301,  TAX MAP 301,  PARCEL 738
                                                        GRASS SWALE       WOOD                N/F SILVESTER  N/F BEATRICE COLLICK, et al.  TAX MAP 301,  TAX MAP 301, PARCEL 741  PARCEL 740  PARCEL 739  DEED:  SVH 5806/ 317  IS COMMONLY USED, COMPLETE SURFACE COVERAGE WITH
                                                                                                                             DEED:  SVH
                                                                                               SMITH, et ux.
                                                       SEE DETAIL D-11 & 12  RAMP              TAX MAP 301,  TAX MAP 301, PARCEL 743  PARCEL 742  DEED:  SVH 4428/ 547  2151/ 432  DEED:  69/ 364  VEGETATION IS NEEDED.
                                                        SHEET C-501  6" PVC  ~                        DEED:  RHO 1682/ 568  DEED:  SVH 5685/ 191  PLAT:  PAGE 435
                                                                                               PARCEL 744
                               INV. OUT: 22.52  PROPOSED     S                                DEED:  SRB 6041/ 237                                      4.2. CHECKING THE GRAVEL WETLAND SURFACE FOR STANDING
                                     SUBMERGED                                                                                                            WATER OR OTHER EVIDENCE OF RISER CLOGGING, SUCH AS
                                    GRAVEL WETLANDS  FUTURE COMMERCIAL DEVELOPMENT  WM  8" PVC                                                            DISCOLORED OR ACCUMULATED SEDIMENTS.
                                                 PAD SITE                       OFFICE
                                                                               BUILDING                                                                 4.3. CHECKING THE SEDIMENTATION CHAMBER OR FOREBAY FOR
                          ROP-II                                                                                                                          SEDIMENT ACCUMULATION, TRASH, AND DEBRIS.  Atlantic Group  10044 Old Ocean City Boulevard Berlin, Maryland 21811  Ph: (410) 629-1160 Fax: (410) 629-1710 www.the-atlanticgrp.com
                                                                                              DEED BOOK ODC 42 PAGE 450
                         3+44.05                                                              10' WIDE ACCESS EASEMENT TO                               4.4. INSPECT TO BE CERTAIN THE SEDIMENTATION FOREBAY DRAINS
                                      10' MAINTENANCE                  ~
                             3+00
                               SGW2    & ACCESS                                               CYRUS WARREN LANDS, NOW                                     WITHIN 24 TO 72 HRS.
                                       EASEMENT                                               BELIEVED EXTINGUISHED.   SEQUENCE OF CONSTRUCTION: SGW1
                                      D-15                                                                                                              4.5.  CHECKING INLETS, OUTLETS, AND OVERFLOW SPILLWAY FOR  & Associates, Inc.
                                      C-501       40' ACCESS                                                                                              BLOCKAGE, STRUCTURAL INTEGRITY, AND EVIDENCE OF
                          -2.83%                  EASEMENT                                                Step 1:   Stabilize the Drainage Area. Dewater facility during the transition from TSB-1 to SGW1 using approved skimmering device  EROSION.
                                                                                                              or geotextile bag. Regrade to design dimensions.
                                                                                                          Step 2:   Assemble Construction Materials on-site, make sure they meet design specifications, and prepare any staging areas. Ensure  4.6. REMOVAL OF DECAYING VEGETATION, LITTER, AND DEBRIS.
                                    2+00                                                 PLAYGROUND                                                    5.  SEDIMENT ACCUMULATION IN THE PRETREATMENT AREAS SHOULD
                                                                                                              that appropriate compaction and dewatering equipment is available. Locate the project benchmark and if necessary transfer
                                                                                                              a benchmark nearer to the Submerged Gravel Wetland location for use during construction.  6.  BE REMOVED AS NECESSARY.
                                              0+00
                                                                                                                                                        SIGNS OF UNEVEN FLOW DISTRIBUTION WITHIN THE WETLAND MAY
                                                                                                              Install Erosion and Sediment Controls prior to construction, including temporary de-watering devices and stormwater
                                                                                                          Step 3:
                                                                                                              with turf grass, native plantings, or other approved methods of soil stabilization. See sheet C-501 for details.
                                                                                                                                                        AND/OR UNDERDRAIN MAY NEED TO BE REMOVED, CLEANED, AND
                                   ROP-I  PROPOSED ENTRANCE DRIVE -0.25%  BH-2  BH-3  APPARENT  PRIVACY FENCE  Step 4:   diversion practices. All areas surrounding the Wet Pond that are graded or denuded during construction must be planted  MEAN THAT THE GRAVEL OR UNDERDRAIN IS CLOGGED. THE GRAVEL
                                                                                                              Clear and Strip the embankment area to the desired sub-grade.
                                                                                                                                                        REPLACED.
                                       INV. OUT: 23.91
                                                      OCCUPATION
                              22.5'        BH-1       AS ILLUSTRATED                     OFFICE BUILDING  Step 5:   Install Outfall Structure, Pipe, and riprap.  7.  A DENSE STAND OF WETLAND VEGETATION SHOULD BE MAINTAINED
                                                                                                          Step 6:
                                                      PLAT: 2412 F.595
                                                                                                              Excavate/Grade until the appropriate elevation and desired contours are achieved for the bottom and side slopes of SGW1.
                                                                              OFFICE                                                                    THROUGH THE LIFE OF THE FACILITY WITH PLANTINGS REPLACED AS
                                           SD-01                                                              Install base stone per cross section D-14/C-501.  NEEDED.
                                         1+00
                                           18" HDPE                           BUILDING                    Step 7:   Stabilize Exposed Soils with the approved seed mixtures appropriate for the perimeter area of SGW1. All areas above the
                                           L: 40.29'                                                                                                   8.  INLETS AND OUTLETS TO EACH SUBMERGED GRAVEL WETLAND CELL
                                           S: 0.16%                                                           permanent pool elevation should be permanently stabilized in accordance with the vegetative stabilization specifications on  SHOULD BE FREE FROM DEBRIS TO PREVENT CLOGGING.
                                                                                                              the approved Sediment and Stormwater Management Plan. See sheet C-501 for details.
                                           INV. IN: 23.97                                                 Step 8:   Plant the Submerged Gravel Wetland per sheet C-108. See wetland seed mix this sheet.  9.  EROSION AT INFLOW POINTS SHOULD BE REPAIRED. FLOW SPLITTERS
                             D=33° 08' 23"          N/F PATRICK H. SCANLON                                                                              SHOULD BE FUNCTIONAL TO PREVENT BYPASSING OF THE FACILITY.
                              R=250.00'               LOT 1 P/O 686
                              L=144.60'             TAX MAP 301, PARCEL 685
                             N40°00'02"W             DEED:  RHO 2412/ 591
                              C=142.59'               PLAT:  PG. 595
                                            N/F PATRICK H. SCANLON
                                            TAX MAP 301, PARCEL 685
                                            DEED:  RHO 2412/ 591
                                             PLAT:  PG. 595
                                                                                            WAREHOUSE
                                EXISTING  OFFICE COMPLEX  ROW VARIES  FRANKLIN  MACHINE  WAREHOUSE                                                 WETLAND SEED MIX
                                                         SHOP
                                                                                                    29'                         PERCENT OF MIX  SCIENTIFIC NAME  COMMON NAME  WETLAND INDICATOR STATUS  STORMWATER
                                       AVENUE
                                                                                                             RAILROAD   AVENUE                                                     MANAGEMENT
                                                                                                           29' ROW  N/F HISTORIC RAILROADS, INC.                                      PLAN
                                                       30' WIDE PERPETUAL ROW                                 TAX MAP 301, PARCEL 683
                                                   30'               ITEM No. 2                                DEED:  FWH 441/ 014
                                                                     ITEM No. 4                      60'
                                                                                                               PLAT:  WCL 85/ 027
                                     DISTURBED                                                                                                                                    PROJECT:  No.  DATE:  12/2/2019
                                      CMF                       FORMER B & E RR ROW
                                                    60'
                                                                                                                                                                                  DRAWN BY:  CDD  SCALE:  1" = 50'
                                                                           DISTURBED                                                                       8.13.25 PC Meeting Packet_pg. 60 of 78
                                                                            CMF                                                                                                   SHEET:
                                                                                                     N/F ST. PAUL UMC                                                                 C-107
                                                                                                    TAX MAP 301, PARCEL 735
                                                                                                      DEED:  26/ 87          Notes: Seed mix at rate of 20lbs/acre mixed with 10lbs/acre annual ryegrass (Lolium multiflorum) seeded as a companion to Wetland seed mix.
                                      TYPICAL 2' WIDE
                                                                                              N/F DENA D.
   64   65   66   67   68   69   70   71   72   73   74