Page 20 - planning-committee-packet
        P. 20
     6S
                   1S
                                                                         P-3 (Blue)
               PRE-1 (Yellow)
                                                 3S           5P            8L            7P           4S
                                             P-1 (ORANGE)   P-1 SGW 1      SP-1         P-2 SGW 2   P-2 (PURPLE)
                 Subcat    Reach     Pond      Link               Routing Diagram for Concept HydroCAD-230550
                                                                Prepared by Lane Engineering, LLC,  Printed 5/26/2025
                                                            HydroCAD® 10.00-17  s/n 03788  © 2016 HydroCAD Software Solutions LLC
                                                                            8.13.25 PC Meeting Packet_pg. 18 of 78





